UYANG BELTING quadrilateral flat guide strips are specially engineered for PVC/PU conveyor systems, featuring an innovative geometric design that represents a significant advancement over traditional V-guides, delivering more reliable tracking solutions for modern industrial conveying.
UYANG BELTING quadrilateral flat guide strips are specially engineered for PVC/PU conveyor systems, featuring an innovative geometric design that represents a significant advancement over traditional V-guides, delivering more reliable tracking solutions for modern industrial conveying.
Typical Applications
✓ Food processing lines
✓ Packaging and logistics conveying systems
✓ Precision electronic component handling
✓ Mining and heavy-load environments
Key Features
Installation & Maintenance
Available Options
• Standard colors: Black/Green/Blue/White (food-grade)
• Custom colors: Available per Pantone color chart
• Sizes: Ranging from 8×8mm to 20×20mm
Note: Special versions including conductive and anti-bacterial types are available upon request. Custom solutions can be developed to meet specific requirements.
Reliable delivery schedules and warehousing support.
Competitive pricing to maximize overall value.
Diverse options to cater to all market segments.
Flexible MOQ Support with all types of goods;
Personalized logo customization on the products
Provide online technical support for all product usage and installation processes
Quick first response to all inquiry and questions
Provide quality images, Video to enhance sales revenue
Efficient production and ship within 15 days at the fastest.
Generally it is 10-15 days, if peak season, it will be about 15-20 day safter receiving the deposit
1. Confirmed Specification: thickness,color, plies,characteristic, and industry;
2. Samples sending: we send samples for you check.or you send us samples if customized belt.
3. Confirm Order: Signing sales contract after samples confirmed.
4. Deposit: 30% deposit before mass production.
5. Production arranged : we will process the production.
6. Remaining payment: after inspection, balance before shipment.
7. Shipping: we will ship the goods to destination port.
8. Confirm bill of loading/commercial invoice/packing list/certificate of origin;